The job you see here was carried over a 4 week period. This was one of our bigger jobs. This included a full rip out of the original bathroom suite and tiles, the plaster was removed to expose the brickwork, the old hot water cylinder was removed and a new unvented cylinder located in the attic. This helped create more space in bathroom. The cupboard where the hot water cylinder was kept was also removed. The room was then boarded, plastered, and fully tiled. All the furniture here was supplied by the customer.